This browser is not fully supported by Historic England. Please update your browser to the latest version so that you get the best from our website.

The Iron Bridge

List Entry Summary

This monument is scheduled under the Ancient Monuments and Archaeological Areas Act 1979 as amended as it appears to the Secretary of State to be of national importance. This entry is a copy, the original is held by the Department for Culture, Media and Sport.

Name: The Iron Bridge

List entry Number: 1015325

Location

The monument may lie within the boundary of more than one authority.

County:

District: Telford and Wrekin

District Type: Unitary Authority

Parish: The Gorge

National Park: Not applicable to this List entry.

Grade: Not applicable to this List entry.

Date first scheduled: 18-Jan-1934

Date of most recent amendment: 07-Feb-1997

Legacy System Information

The contents of this record have been generated from a legacy data system.

Legacy System: RSM

UID: 27558

Asset Groupings

This list entry does not comprise part of an Asset Grouping. Asset Groupings are not part of the official record but are added later for information.

List entry Description

Summary of Monument

Legacy Record - This information may be included in the List Entry Details.

Reasons for Designation

Iron was used as one of the components of bridge construction for at least a thousand years before it was first used as the principal construction material in the Iron Bridge erected by Abraham Darby in 1779 over the Severn at Coalbrookdale. Despite its use of iron, however, the Iron Bridge simply copied existing construction techniques suited to timber, and therefore did not make maximum use of the new material's potential. The engineer Thomas Telford subsequently recognised that the lighter cast iron frames allowed the use of flatter angles and less substantial foundations, whilst still enabling single spans and avoiding the central piers which hindered navigation and caused instability by attracting water-scouring. The development of the single span cast iron bridge thus represented a turning point in British bridge design and engineering. All examples which retain significant original fabric are of national importance and will merit statutory protection.

The Iron Bridge is a fine example of a class of monument which is rare nationally, and is often seen as a symbol of the heyday of British bridge design, if not of the Industrial Era itself. The standing structure of the bridge increases our understanding of the casting and assembly methods employed during this pioneering age. Archaeological deposits will survive below ground relating to its construction, and to the modification of its abutments over time. An extensive written and pictorial archive records the conception, design, construction and modification of the bridge, as well as its impact on the wider infrastructure and industrial development of the area. This World Heritage Site is a prominent landmark, with easy public access.

History

Legacy Record - This information may be included in the List Entry Details.

Details

The monument includes the standing and buried remains of The Iron Bridge, an 18th century single span, cast iron bridge which links the steep sides of the Ironbridge Gorge across the River Severn, and is now at the heart of the settlement to which it gave its name.

The initial bridge design was drawn up by Thomas Pritchard, a Shrewsbury architect, who had suggested to the ironmaster John Wilkinson in 1773 that an iron bridge should be constructed across the river. In 1776 a petition to parliament for a new bridge was successful, however iron had only been used for strengthening timber or stone structures in the past, and it was several months before the plan to construct the world's first completely cast iron bridge was agreed. Work began in 1777, to a design evidently instigated by Pritchard's original, although he himself had died earlier that year. The chosen crossing point, previously the ferry crossing from Benthall to Madeley Wood, had the advantage of high approaches on both sides and relative stability, but its distance from existing turnpikes and the major ironworks pushed up the total cost of construction to over 6000 pounds. Part of this expense was borne by Abraham Darby himself, who remained in debt for the rest of his life. The iron for the bridge was cast by the Coalbrookdale Company, and construction was completed in 1779, using in all 300 tons of cast and wrought iron. The bridge was originally carried between two huge rubble- filled, ashlar faced, stone abutments. It had a wrought iron hand rail which continued along the edges of the northern abutment, while a post and chain rail ran along the sides of the southern abutment. However, episodes of subsidence and flooding caused the southern abutment to crack, and it was replaced in 1801 with two stone piers, with a wooden roadway and hand rail between them. The wooden structure was in turn replaced in the 1820s by the iron arches which stand today, and an iron hand rail replaced the wooden one. On the north side the original parapet walls and footings were taken down in 1782 to accommodate one of the many buildings which were erected to either side of the north abutment. Shortly after this the west wall was also removed, probably as part of the construction of the Tontine stables close to the bridge abutment. The Iron Bridge remained in full use for over 150 years, by carts, stage coaches, and then increasing amounts of vehicular traffic. Concerns about its stability in the 1920s nearly led to its replacement with a concrete structure further upriver. In 1934 the bridge was designated an Ancient Monument and closed to vehicular traffic. In the 1970s a concrete strut was built on the river bed beneath the bridge, to brace the abutments which had moved 0.48m towards each other by 1969, and this structure is included in the scheduling. The Iron Bridge is now in the care of the Secretary of State, is Listed Grade I, and is part of the Ironbridge World Heritage Site designated in 1987.

The bridge is constructed of cold blast iron, and spans 100 feet 6 inches (c.30m). The main structure is composed of five semicircular ribs, braced laterally to each other, and by a filigree of connecting members to two concentric inner part ribs. The two outer ribs are engraved with the words `This Bridge was cast at Coalbrook-Dale and erected in the year MDCCLXXIX'. The spandrels, between the curve of the arch and the abutments, contain iron circles and an ogee shaped frame, both features of Thomas Pritchard's other designs. The bridge has delicate wrought-iron hand rails with a central ornamental roundel to either side, which early drawings indicate were originally surmounted by single lamps. Early illustrations show that shops and houses grew up around the northern abutment soon after the bridge was completed, and after several phases of rebuilding these were finally demolished in the 1950s. The frontage of some cellars has been retained on the west side of the abutment, and the surrounding area has been landscaped with flowerbeds and brick retaining walls. There are brick steps down to the river on the east side, and modern parapets and railings edge a paved area extending across the northern approach to the bridge. The side arch under the northern abutment has a brick vault. Two side arches replaced the matching brick arch on the south side; each has a single iron span with a semicircular arch braced to concentric inner ribs, echoing the design of the main bridge span. The supporting piers are of coursed sandstone blocks. A brick toll house, now an information centre, sits on the west side of the south abutment. The original structure is contemporary with the bridge, and was extended in the mid-19th century. A metal gate extends between the toll house and a small brick building on the east side, which was part of the original gate arrangement. Modern steps lead down the east side of this building, against the southern abutment, to the path along the river which passes under the southerly of the two side arches.

All modern road and path surfaces, modern railings and fences, benches, signposts and bollards, rubbish bins, modern retaining walls and steps, the archways to the west of the northern abutment, modern drain pipes and guttering, the cellar frontage at the north end of the bridge, and the gate, toll house and brick building at the southern end of the bridge, are excluded from the scheduling, although the ground beneath all these features is included.

MAP EXTRACT The site of the monument is shown on the attached map extract. It includes a 5 metre boundary around the archaeological features, considered to be essential for the monument's support and preservation.

Selected Sources

Books and journals
De Haan, D, Abraham Darby's iron bridge of 1779: construction and restoration, (1992), 1-9
Other
photos, Bracegirdle, B and Miles, P H, Great engineers and their works: Thomas Telford, (1973)
photos, sections, Clark, C, Ironbridge Gorge, (1990)
photos, Smith, Stuart, A View from the Iron Bridge, (1979)

National Grid Reference: SJ 67241 03398

Map

Map
© Crown Copyright and database right 2017. All rights reserved. Ordnance Survey Licence number 100024900.
© British Crown and SeaZone Solutions Limited 2017. All rights reserved. Licence number 102006.006.
Use of this data is subject to Terms and Conditions.

The above map is for quick reference purposes only and may not be to scale. For a copy of the full scale map, please see the attached PDF - 1015325 .pdf

The PDF will be generated from our live systems and may take a few minutes to download depending on how busy our servers are. We apologise for this delay.

This copy shows the entry on 23-Nov-2017 at 08:43:45.

End of official listing