Construction vehicles at work during the construction of the Midland Link Motorway, between Junction 13 and Junction 11 of the M6

Date:
May 1965
Location:
South Staffordshire, Staffordshire
Reference:
JLP01/08/071031
Type:
Photograph (Negative)
Not what you're looking for? Try a new search

Description

The work on the Midland Link section of the M6 Motorway between Dunston to Shareshill (Junction 13 - Junction 11) was carried out by the Civil Engineering Division of the John Laing Construction Ltd. The motorway opened to traffic on March 14th 1966. The vehicles shown are an auto-mix paving machine laying dry lean concrete on the motorway and a side discharge tipping lorry deposing concrete into its hopper.

This image was catalogued as part of the Breaking New Ground Project in partnership with the John Laing Charitable Trust in 2019-20.

Content

This is part of the Series: JLP01/08 John Laing Photographic Collection Black and White Negatives; within the Collection: JLP01 John Laing Photographic Collection

Rights

© Historic England Archive. John Laing Photographic Collection

Keywords

Mid 20th Century Motorway, Construction