A view across the Great Ouse Relief Channel looking towards the installation of the Fens gas pipeline, showing a dredging tractor in the foreground

Date:
20 Sep 1967
Location:
CAMBRIDGESHIRE
Reference:
JLP01/08/077175
Type:
Photograph (Negative)
Not what you're looking for? Try a new search

Description

Work on laying the Fens gas pipeline started in June 1967 and was a joint venture between Laing Civil Engineering and French companies Entrepose and Grands Travaux de Marseille (GTM) for the Gas Council. Over 600 men worked on the project to lay 36 inch diameter steel pipes starting at West Winch in Norfolk and running to where it linked up with the next contract at Woodcroft Castle in Cambridgeshire. The pipeline crossed four rivers and numerous dykes and ditches.

This image was catalogued as part of the Breaking New Ground Project in partnership with the John Laing Charitable Trust in 2019-20.

Content

This is part of the Series: JLP01/08 John Laing Photographic Collection Black and White Negatives; within the Collection: JLP01 John Laing Photographic Collection

Rights

© Historic England Archive. John Laing Photographic Collection

Keywords

Late 20th Century Pipeline, Engineering, Waterscape