An elevated view of the precasting yard for the outfall of the Peel Common Sewage Works at Browndown, showing concrete units for the underwater section

Date:
20 Jun 1978
Location:
Browndown, Gosport, Gosport, Hampshire
Reference:
JLP01/09/781619
Type:
Photograph (Negative)
Not what you're looking for? Try a new search

Description

Laing Civil Engineering were contracted to construct the Browndown Outfall for the Southern Water Authority, as part of the South Hampshire Main Drainage Scheme for the treatment and disposal of sewage. Browndown Outfall is a 1km long underwater culvert which transports treated sewage from Peel Common Sewage Works, another contract carried out by Laing. The outfall was built in sections which were linked together in a chain on the seabed. The landward section of the outfall was cast in-situ in a temporary cofferdam.

This image was catalogued as part of the Breaking New Ground Project in partnership with the John Laing Charitable Trust in 2019-20.

Content

This is part of the Series: JLP01/09 John Laing Photographic Collection Black and White Negatives 1974-1994; within the Collection: JLP01 John Laing Photographic Collection

Rights

© Historic England Archive. John Laing Photographic Collection

Keywords

Late 20th Century Sewage Works, Coastal, Engineering