The foundation tub for a second 509 Revolver crane being lifted on to a gantry at Graythorp
- Date:
- 1973
- Location:
- Graythorp , Graythorp, Hartlepool
- Reference:
- JLP01/10/01067
- Type:
- Photograph (Transparency)
In the early 1970s Laing Pipelines Offshore constructed the Graythorp fabrication yard and dry dock on the site of the old William Gray Shipyard. The company created a dry dock which was used for the construction of fixed platform North Sea drilling rigs for the BP North Sea Oil Project. By 1972, one thousand men were working on site to build a tubular structure which would support a drilling rig in the North Sea destined for the Forties Oilfield. The cranes on site at Graythorp included two 509 Revolver cranes, capable of lifting 813 tonnes, and six Manitowoc cranes imported from America.
This image was catalogued as part of the Breaking New Ground Project in partnership with the John Laing Charitable Trust in 2019-20.
This is part of the Series: JLP01/10 John Laing Photographic Collection Colour Negatives and Transparencies; within the Collection: JLP01 John Laing Photographic Collection
© Historic England Archive. John Laing Photographic Collection
Late 20th Century Marine Engineering Works, Late 20th Century Dry Dock, Late 20th Century Crane, Construction, Industrial Heritage
Our website works best with the latest version of the browsers below, unfortunately your browser is not supported. Using an old browser means that some parts of our website might not work correctly.