Job: Neptune Energy Park, Neptune Historic Dry Dock, Fisher Street, Walker, Newcastle upon Tyne

Date:
20 Jun 2017 - 21 Jun 2017
Location:
Neptune Energy Park, Fisher Street, Walker, Newcastle upon Tyne
Reference:
2K/21930
Type:
Job containing Electronic material
Placeholder image for archive collection
Not what you're looking for? Try a new search

Description

For offshore planning. Photographer's note, images show 'the 60m high Blyth Offshore Demonstrator Wind Farm gravity based foundations under construction before being floated out into the River Tyne at high tide and out to sea. It will be the first offshore wind project to use a 66kV rated inter array to connect turbines to a new onshore sub station at Blyth.'

Content

This is part of the Volume: VF000001 General English Heritage & Historic England Incoming Digital Photography; within the Series: EHC01/068 Incoming English Heritage Digital Field Photography; within the Collection: EHC01 English Heritage(EH):Archive

This Job is divided into 21 Child Records
This Job contains the following materials:
Photograph (Digital): 21

Rights

© Historic England Archive

People & Organisations

Photographer: Bull, Alun: Historic England

Keywords

Dry Dock, Shipyard, Construction, Engineering, Science And Technology