General view of the roof of a wind turbine nacelle at the offshore windfarm pre-assembly site, showing the passive cooling system for the generator and converter systems, with primary and secondary weather stations, an aviation warning light and an hydraulic opening hatch, from the south-east
- Date:
- 18 Jun 2025
- Location:
- Siemens Gamesa Renewable Energy, Sir William Siemens Way, Alexandra Dock, City of Kingston upon Hull
- Reference:
- DP572279
- Type:
- Photograph (Digital)