In November 1979, Laing Industrial Engineering and Construction Ltd (also referred to as the IE&C team) started work on an extension to Coryton Oil Refinery. The residual upgrading of the refinery was carried out by Pullman-Kellogg, with Laing as sub-contractors. A huge amount of pipework had to be prefabricated and installed as part of the construction. Pipework also had to be connected from the existing refinery to the extension, which was a Fluidised Catalytic Cracker (FCC) plant.
The photograph shows the pipe rack in second avenue carrying pipe runs and expansion loops at two levels, with the existing process plant in the background and part of the new FCC Plant at centre right.
This image was catalogued as part of the Breaking New Ground Project in partnership with the John Laing Charitable Trust in 2019-20.
This is part of the Series: JLP01/10 John Laing Photographic Collection Colour Negatives And Transparencies; within the Collection: JLP01 John Laing Photographic Collection
© Historic England Archive. John Laing Photographic Collection
Mid 20th Century Oil Refinery, Engineering, Industrial Heritage