Electricity distribution schematics and plan for the proposed new system to the Keep and Keep Yard from a new switchroom

Date:
Sep 1980
Location:
Dover Castle, Keep Yard, Dover, Kent
Show all locations
Dover Castle, Keep, Keep Yard, Dover, Kent
Reference:
MP/DOV1358
Type:
Drawing
Not what you're looking for? Try a new search

Description

The new switchroom is in Keep Yard just to the east of Palace Gateway. The plan shows the lines to each building, shown as ground-floor room plans. The schematic gives technical specifications and there is a table identifying and describing each new distribution line. An alternative system for new cabling is set out in MP/DOV1407.

Content

This is part of the Job: PF/DOV/044 Underground Electrical Services Distribution Schematics At Dover Castle; within the Volume: PF/DOV Dover Castle, Kent; within the Series: EHC01/022 English Heritage Plans And Measured Drawings; within the Collection: EHC01 English Heritage(Eh):Archive

Rights

© Crown Copyright. Historic England Archive

Keywords

Medieval Keep, Medieval Bailey