Copy of a plan of the northern part of the castle showing the electrical distribution system of LV cables to the Keep Yard buildings with a detailed plan of the cable route into nine Keep Yard - as installed

Date:
Dec 1983
Location:
Dover Castle, Dover, Kent
Reference:
MP/DOV1416
Type:
Measured Drawing
Not what you're looking for? Try a new search

Description

No scale is given for the detailed plan. This has the same job number and drawing number as MP/DOV1406 but is a different drawing. It is the same as MP/DOV1415 but two notes have been changes and the notes at the side have been removed. See MP/DOV1357 - 1359 and MP/DOV1406 - 1411 for other details of electricity distribution in this area.

Content

This is part of the Job: PF/DOV/046 Electrical Distribution Schematics For The Inner Bailey Of Dover Castle; within the Volume: PF/DOV Dover Castle, Kent; within the Series: EHC01/022 English Heritage Plans And Measured Drawings; within the Collection: EHC01 English Heritage(Eh):Archive

Rights

© Crown Copyright. Historic England Archive

Keywords

Castle, Bailey