Site plan and elevation showing the proposed installation of a new electrical supply for a summer shop and floodlighting of the castle wall and the keep

Date:
Dec 1987
Location:
Peveril Castle, Castleton, High Peak, Derbyshire
Reference:
MP/PER0032
Type:
Measured Drawing
Not what you're looking for? Try a new search

Description

The drawing is comprised of a front elevation showing the general arrangement of the equipment in a new feeder pillar housing, with a schematic of the equipment to be located inside it, a site plan showing the proposed route of the cable, and sections showing standard cable trenches. There is one limited area that has been hand-tinted in crayon. There is a section of notes, and a section explaining the scope of the work. Design is by 'HBMC M&E section.' The senior engineer was P.Mann, the job engineer was K.Gofton. It was drawn by 'DRI.' The job no. is 87074.

Content

This is part of the Volume: PF/PER Peveril Castle, Castleton; within the Series: EHC01/022 English Heritage Plans And Measured Drawings; within the Collection: EHC01 English Heritage(Eh):Archive

Rights

© Historic England Archive

Keywords

Medieval Castle