This browser is not fully supported by Historic England. Please update your browser to the latest version so that you get the best from our website.

D-Day landing craft maintenance site, 170m north of Saltash Pier

List Entry Summary

This monument is scheduled under the Ancient Monuments and Archaeological Areas Act 1979 as amended as it appears to the Secretary of State to be of national importance. This entry is a copy, the original is held by the Department for Culture, Media and Sport.

Name: D-Day landing craft maintenance site, 170m north of Saltash Pier

List entry Number: 1020053

Location

The monument may lie within the boundary of more than one authority.

County:

District: Cornwall

District Type: Unitary Authority

Parish: Saltash

National Park: N/A

Grade: Not applicable to this List entry.

Date first scheduled: 11-Dec-2001

Date of most recent amendment: Not applicable to this List entry.

Legacy System Information

The contents of this record have been generated from a legacy data system.

Legacy System: RSM

UID: 15557

Asset Groupings

This list entry does not comprise part of an Asset Grouping. Asset Groupings are not part of the official record but are added later for information.

List entry Description

Summary of Monument

Legacy Record - This information may be included in the List Entry Details.

Reasons for Designation

D-Day, June 6th 1944, is one of the most significant dates in modern history, defining the start of the final phase of World War II in Europe. After 2-3 years of preparations, the assault phase of `Operation Overlord' - codenamed Neptune - lasted for little over three weeks and by 30 June had landed over 850,000 men on the invasion beachheads, together with nearly 150,000 vehicles and 570,000 tons of supplies. Sites used for the building, maintenance and repair of landing craft and landing ships were essential to developing and retaining a fleet capable of delivering Prime Minister Churchill's `great plan'. With so many vessels involved (landing craft and landing ships principally, but there were 46 different types in all), construction and maintenance were significant tasks. Contemporary descriptions refer to unprecedented levels of maritime activity, with every port, harbour and boatyard being involved, in addition to beaches and the streets of coastal towns and villages. The more substantial sites were either in largely unmodified dry docks or on specially built `gridirons' or slipways. The gridirons were used for maintenance, and took the form of a series of parallel concrete slipways running down a slight gradient into the water, allowing the boat to be floated on at high tide and repaired at low tide; some were supplied with a winch mechanism for pulling vessels onto the grid, and steel mooring points (`dolphins') for securing them when afloat. Recorded examples include sites on the Rivers Dart (Devon), Tamar and Fal (Cornwall), and in Portsmouth Harbour. Slipways, with a metal rail, winch mechanisms and dolphins, used for landing ship repairs, are recorded on the River Dart. However, much construction, repair and maintenance work was conducted on an ad hoc arrangement and leaves little trace: for example, landing craft (assault) - LCAs - were small vessels constructed and repaired mainly in back streets and improvised hards at the water's edge. Although in military archaeology fixed defences will often survive better than materiel representing the mobile offensive, sufficient of the preparations for D-Day in England remains to give an impression of the scale of the Operation, and the variety of the specific tasks involved. All sites where surviving remains provide an impression of the scale and nature of the preparations for D-Day will be considered of national importance.

The D-Day landing craft maintenance site, 170m north of Saltash Pier survives well, retaining its coherent grouping of related structures, clearly visible and barely affected by later activity. The gridiron retains all 12 piers, most to full length and with only limited truncation of the southernmost pier from the later bridge-building. Its physical survival is complemented by valuable recorded detail about the site's operational history and its wider context within the US naval base at Plymouth, making this maintenance site a well-documented example of its class. The historical records emphasise this site's role as an integral part of the overall maintenance and embarkation facilities along and behind the coastline bordering the Tamar Estuary and Plymouth Sound, together forming the infrastructure necessary for successful preparation and execution of the D-Day landings.

History

Legacy Record - This information may be included in the List Entry Details.

Details

The monument includes a maintenance site built beside the River Tamar estuary at Saltash in south east Cornwall to service landing craft during the preparations, engagement and aftermath of the 1944 D-Day landings during World War II. The site includes an arrangement of parallel concrete piers called a `gridiron', an adjacent mooring frame and a small quay, grouped on the western shore of the River Tamar, partly beneath and extending north from the modern suspension road bridge across the river. Operating from 1943 to 1945, the monument formed part of the Saltash sub-base of the United States Naval Advanced Amphibious Base (USNAAB) at Plymouth. The gridiron was designed to allow landing craft to be floated over it at high tide then moored, coming to rest upon it as the tide fell and enabling inspection, scraping and repairs to be carried out. Overall the gridiron measures 54.3m wide, NNW-SSE, and contains 12 parallel straight piers centred 4.85m apart. The piers, approximately 34m long north east-south west, slope gently down the intertidal shore and are built of shuttered concrete, with casts of shuttering planks where their surfaces are sufficiently well- preserved. The seaward 18m of the southernmost pier was removed for construction of the Tamar Bridge. Each pier is of rectangular section, 0.61m wide, rising to 0.72m from the foreshore surface though also overlain in places by shingle banks and riverine mud. Recessed along the upper edges of each pier are opposed metal angle-brackets, centred 3.2m apart, bolted together through the thickness of the pier and each with four bolt-holes facing upwards to secure timbers formerly laid along the piers' upper surfaces. At the seaward end of the sixth pier from the north, a horizontal metal pin is supported above the pier surface by two short upright brackets. An aerial photograph of 1946 confirms the gridiron's original complement of 12 piers. It also shows, close behind the landward side of the gridiron, two small, bright features considered to have been mooring structures: one beside the end of the northern pier and since removed; the other at the end of the eighth pier to the south. This latter structure survives to 1.75m high as a framework of square-section timber posts: two vertical uprights, spaced 0.3m apart east-west, braced to north and south by two sloping timbers which meet in the gap at the top of the uprights. The whole assemblage was pinned together by four metal ties through the top and a timber block maintained the spacing at the base of the uprights. Immediately behind the gridiron's southern four piers is a small raised quay, also visible on the 1946 aerial photograph. The quay is 20.5m long, NNW-SSE, by up to 13.7m wide, faced on the east, towards the gridiron, by a vertical shuttered-concrete revetment wall, 2.15m high; the quay's northern wall comprises coursed end-set slabs. Smooth concrete facing at the quay's north east corner reflects later refurbishment. The quay has a flat turf-covered surface, with a sloping ramp at the south forming a slipway beside the southern end of the gridiron. Cobbles set in concrete on the slipway surface provided grip. This maintenance site constituted a key part of the Saltash sub-base, one of three maintenance and repair departments of the USNAAB at Plymouth, whose various facilities were built by the 29th and 81st US Naval Construction Battalions. Records indicate that the Saltash sub-base was set up in November 1943 under the command of Lt Com T H Harris, to service and repair landing craft for infantry and tanks and to service minesweepers. The overall USNAAB at Plymouth was commissioned as a major focal point in preparations for the D- Day invasion, providing a range of shore-base and supply facilities before, during and after the invasion. Throughout this period the base also provided service and repair facilities, as in this scheduling at Saltash, for the numerous craft and vessels involved in the invasion. The strategic value of the USNAAB at Plymouth lessened as the Allied forces advanced across Europe but the Saltash sub-base is recorded as remaining in operation to the end of the war though on greatly reduced personnel, eventually closing on 31 August 1945. The Tamar Bridge, the steps and their railings that ascend from the quay, and all modern signs and mooring lines are excluded from the scheduling, although the ground beneath them is included.

MAP EXTRACT The site of the monument is shown on the attached map extract.

Selected Sources

Books and journals
Clamp, A L, 'Plymouth during the Second World War series' in United States Naval Advanced Amphibious Base Plymouth 1943-45, (1994)
Dobinson, C S, 'Twentieth Century Fortifications in England' in Operation Overlord, , Vol. 5, (1996)
Other
In letter 10/8/1999 to A J Schofield, Nick Johnson CAU, Suggestion regarding classification of D-Day hards & gridirons, (1999)
RAF, 1946 RAF vertical AP of the Saltash railway bridge area, (1946)
Title: 1:10000 Ordnance Survey Map SX 45 NW Source Date: 1983 Author: Publisher: Surveyor:
Title: 1:2500 Ordnance Survey landline mapping, centre point SX43325886 Source Date: 2000 Author: Publisher: Surveyor:

National Grid Reference: SX 43333 58868

Map

Map
© Crown Copyright and database right 2017. All rights reserved. Ordnance Survey Licence number 100024900.
© British Crown and SeaZone Solutions Limited 2017. All rights reserved. Licence number 102006.006.
Use of this data is subject to Terms and Conditions.

The above map is for quick reference purposes only and may not be to scale. For a copy of the full scale map, please see the attached PDF - 1020053 .pdf

The PDF will be generated from our live systems and may take a few minutes to download depending on how busy our servers are. We apologise for this delay.

This copy shows the entry on 16-Dec-2017 at 10:43:39.

End of official listing